Weather conditions were too rough for MOBY and Weather Station
work on 11 Aug; however, personnel were able to test the cellular telephone link at the MOBY mooring on that day.
On 12 Aug, the Weather Station controller was removed (to be replaced with a digital modem in the future), the
antifoulant tubes were recharged, the collector windows were cleaned, and underwater photos of MOBY were taken.
General inspection of MOBY revealed missing flopper-stoppers and slightly damaged (possibly from a fishing boat)
insulation around the watertight MOBY disk box. Personnel were able to determine that loss of data, since 3 Aug,
was due to a full MOBY data disk. Rough weather conditions precluded the performance of diver calibrations
during this trip.
|